Province | Subbasin | % |
---|---|---|
Columbia Cascade | Methow | 50.00% |
Wenatchee | 50.00% |
Previous: | Next: |
---|---|
56662 REL 147: 2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
If needed, Update UCSCSA plan as needed for new sites towards implementation. | B: 174. Update UCSCSA Plan as sites become identified as part of the implementation schedule | 01/31/2020 | 01/31/2020 | |
Final To Date Site List compliance for acclimation | C: 165. Final site list compliance for acclimation | 01/31/2020 | 01/31/2020 | |
Effective implementation management and timely contract administration | D: 119. Manage the UC Spring Chinook and Steelhead Acclimation Project | 01/31/2020 | 01/31/2020 | |
Stakeholder Coordination | E: 191. Coordination of Plan with Regional Stakeholders | 01/31/2020 | 01/31/2020 | |
PIT tag spring Chinook | F: 158. PIT tag up to 15K BY18 Spring Chinook in the Methow basin for 2020 releases | 11/01/2019 | 12/20/2019 | |
Acclimate spring Chinook spring 2019. | G: 176. Acclimate spring Chinook at Goat Wall Pond | 05/15/2019 | 05/15/2019 | |
Construction of the Powerline site | H: 171. Construction of Powerline acc. site for Wenatchee program steelhead | 11/15/2019 | 11/12/2019 | |
Completion of Trinity as an over-winter/acclimation site in the Chiwawa basin | I: 171. Develop additional site in the Wenatchee for spring Chinook-Trinity | 11/30/2019 | ||
Construction Management Complete | J: 100. Construction management for Powerline site | 11/15/2019 | 10/29/2019 | |
Annual report to cover activities from 2/1/17 to 1/31/18 | K: 132. Annual synopsis report for 2017 contract year (February 2017-January 2018); developed as a technical memo or summary of findings | 04/01/2019 | 04/01/2019 | |
Annual report to cover activities from 2/1/18 to 1/31/19 | L: 132. Annual synopsis report for 2018 contract year (February 2018-January 2019); developed as a technical memo or summary of findings | 05/01/2019 | 05/01/2019 | |
Annual report to cover activities from 2/1/19 to 1/31/20 | M: 132. Annual synopsis report for 2019 contract year; developed as a technical memo or summary. | 01/31/2020 | 01/31/2020 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2019 | ||||||
B | 174 | Update UCSCSA Plan as sites become identified as part of the implementation schedule | 02/01/2019 | ||||||
C | 165 | Final site list compliance for acclimation | 02/01/2019 | ||||||
D | 119 | Manage the UC Spring Chinook and Steelhead Acclimation Project | 02/01/2019 | ||||||
E | 191 | Coordination of Plan with Regional Stakeholders | 02/01/2019 | ||||||
F | 158 | PIT tag up to 15K BY18 Spring Chinook in the Methow basin for 2020 releases | 09/19/2018 | ||||||
G | 176 | Acclimate spring Chinook at Goat Wall Pond | 09/19/2018 | ||||||
H | 171 | Construction of Powerline acc. site for Wenatchee program steelhead | 09/19/2018 | ||||||
I | 171 | Develop additional site in the Wenatchee for spring Chinook-Trinity | 09/19/2018 | ||||||
J | 100 | Construction management for Powerline site | 02/01/2019 | ||||||
K | 132 | Annual synopsis report for 2017 contract year (February 2017-January 2018); developed as a technical memo or summary of findings | 02/01/2019 | ||||||
L | 132 | Annual synopsis report for 2018 contract year (February 2018-January 2019); developed as a technical memo or summary of findings | 02/01/2019 | ||||||
M | 132 | Annual synopsis report for 2019 contract year; developed as a technical memo or summary. | 02/01/2019 |